June 22, 2015

 

This time lase shows the build up of the ancillary equipment to the second in a series of nine 400kV/2745kV transformers. These transformers are amongst the biggest ever installed to electrical substations in Scotland. The work location was within a live substation surrounded by 400kV and 275kV circuits requiring the use of the crane’s on-board virtual wall system.

 

 